Month 4: Roofing and Enclosure Completion – September 2024

Posted by:

|

On:

|

This orthomosaic, captured on September 15, 2024, shows the housing estate site pushing forward from our July 28 update.

Compared to the third image, key changes include:

  • Roofing expansion: Additional houses now fully roofed (red/brown tiling), with over half the central structures enclosed.
  • Wall and framing completion: More walls raised and frames filled in the southern and eastern sections, reducing open skeletons.
  • Road and pathway paving: Internal roads and access paths more defined with gravel or asphalt, improving site connectivity.
  • Material reduction: Fewer material stacks and equipment, indicating a shift from heavy groundwork to finishing touches.
  • Site maturation: Expanded built-up area with less visible dirt and more integrated landscaping around the perimeter.